{"version":"https://jsonfeed.org/version/1","title":"ENex Consulting LLC","home_page_url":"https://enexconsultingllc.com","description":"ENex Consulting LLC","author":{"name":"ENex Consulting LLC"},"items":[{"id":"https://enexconsultingllc.com/case-studies/f/dry-gas-seal-failure-investigation-and-start-up-recovery","html_content":"<p>Industry: Oil & Gas (LNG)\nAsset: Centrifugal Refrigeration Compressor\nService: Root Cause Analysis (RCA) & Dry Gas Seal Installation Supervision\nLocation: West Africa</p>","url":"https://enexconsultingllc.com/case-studies/f/dry-gas-seal-failure-investigation-and-start-up-recovery","title":"Dry Gas Seal Failure Investigation and Start-Up Recovery","summary":"Industry: Oil & Gas (LNG)\nAsset: Centrifugal Refrigeration Compressor\nService: Root Cause Analysis (RCA) & Dry Gas Seal Installation Supervision\nLocation: West Africa","date_modified":"2026-07-14T23:36:38Z"},{"id":"https://enexconsultingllc.com/case-studies/f/case-study-increasing-pump-reliability-through-root-cause-analys","html_content":"<img src=\"https://img1.wsimg.com/isteam/ip/9ec933a2-3f7b-48bd-a04f-1eda9f288e89/turbina.png\"/><p>Occidental Chemical Corporation faced recurring mechanical seal failures on a critical API 610 BB2 pump, resulting in an MTBF of only six months, frequent outages, and high maintenance costs.</p>","url":"https://enexconsultingllc.com/case-studies/f/case-study-increasing-pump-reliability-through-root-cause-analys","title":"Increasing Pump Reliability Through Root Cause Analys","summary":"Occidental Chemical Corporation faced recurring mechanical seal failures on a critical API 610 BB2 pump, resulting in an MTBF of only six months, frequent outages, and high maintenance costs.","date_modified":"2026-07-14T23:26:55Z"},{"id":"https://enexconsultingllc.com/case-studies/f/advanced-turbine-repair-that-prevented-eight-months-of-downtime","html_content":"<img src=\"https://img1.wsimg.com/isteam/ip/9ec933a2-3f7b-48bd-a04f-1eda9f288e89/BLOG%201-e066982.png\"/><p>During a major inspection of a GE Frame 7EA Gas Turbine in Alberta, Canada, severe erosion and material loss were discovered in the Compressor Discharge Case (CDC). With no replacement component available and lead times ...</p>","url":"https://enexconsultingllc.com/case-studies/f/advanced-turbine-repair-that-prevented-eight-months-of-downtime","title":"Advanced Turbine Repair That Prevented 8 Months of Downtime","summary":"During a major inspection of a GE Frame 7EA Gas Turbine in Alberta, Canada, severe erosion and material loss were discovered in the Compressor Discharge Case (CDC). With no replacement component available and lead times ...","date_modified":"2026-07-14T04:00:00Z"}]}